Task management

Who's on it, and what's waiting.

A kanban that tells the truth about production work: a Waiting column for everything sitting with a client or a vendor, phases that speak your job's language, and cards that carry people, files and checklists.

No credit card needed. Set up in minutes.

app.studio-flows.com/projects/bright-water/tasks
The task board: To do, In progress, Waiting and Done, with checklists, due dates, attachments and who is on each card.

The problem

Generic task tools have two states: yours and done. On a real job half the work is waiting on somebody outside the building, and a board that cannot say so misreports where the job actually stands.

01

A board with a Waiting column

To do, In progress, Waiting, Done. Waiting is the one that earns its place: location holds, client approvals, vendor quotes. Drag a card as the work moves.

  • Native drag and drop between columns, position remembered
  • Overdue chips computed server-side, so they never flicker or lie
  • Undated tasks sort last: tomorrow's delivery beats a vague intention
  • Add a card straight into any column
02

Or group by the job's phases

One toggle re-columns the same cards into the phases of the job, and the columns rename themselves to the project's type.

  • A live-action job reads Pre-pro, Shoot, Post, Delivery
  • An AI job reads Concept and Generation, automatically
  • An Anytime column holds work that belongs to no phase
  • Board or list: the board answers 'where is everything', the list answers 'what is next'
03

Cards that hold the work

A card is not a title. It is the people on it, the files behind it, and the steps inside it.

  • Several assignees per card, because a delivery is the editor and the producer
  • Files with image previews on the card face: the location photo is visible without a click
  • Named checklists, several per card, with progress
  • Notes to the team, threaded on the card

The difference

Waiting is a first-class answer.

On a commercial job, a huge share of open work is not blocked by your team at all. It is sitting with an agency, a location owner, or a client who has the cut. A board that pushes all of that into 'in progress' tells the producer a comfortable lie.

  • Waiting is its own column, so the morning question 'what do I chase' has a view
  • Phase grouping shows the same work the way the job actually flows
  • Assignees, files and checklists live on the card, not in four other tools

In progress

Waiting

Location hold: rooftop

With the client

Done

Waiting is a real answer: half of production is somebody else's move.

A task board with a Waiting column, one card mid-drag toward Done.

More the board does

Invite from the picker

Realize you need a colleague mid-card, invite them right there.

Pending invites shown

An invited person is named under the picker until they accept.

Crew can write

Collaborators on the job can add and check off tasks, not just read them.

Due dates

With overdue in red, on the card and in the list.

List view

The same cards as a prioritized run-down for phones and mornings.

Hub card

Open task count on the project's front page.

Run your next job in Studio Flows.

Your first project is free, with no card and no countdown.

Start free

No credit card needed. Set up in minutes.